New studs for Telegraph Hill 29.05.2010

The temporary stud wall to protect the storage area (that we built in April before the floor slab was cast) needed to be demolished again, in preparation for the building of new walls sitting on the back edge of the floor slab.

So four of us did that. The materials are ready to be recycled yet again.

We also started to paint the rear brick wall.

During the week, Ian continued to build one of the glazed walls – it can be seen on the left.